Electricity:
The power supply is provided by the CEZ Electrica network, through its own transformation station and 2 separate air lines of 110KV, as well as a 20 KV airline. The installed power is of maximum 32 MW/h.
Sewage:
there
is wastewater and pluvial sewerage network
Water:
2 connections with a cumulated flow of up to 800 mc/h, connected to the city supply network.
Methane:
2 connections
with a cumulated flow of 2400 mc/h, connected to Distrigaz Sud distribution network.
Telephony/Internet:
services provided through existing supply networks in the area.